285 SOUTH WESTERN HWY, ARMADALE WA ● 24/7 EMERGENCY RESPONSE
DWS Dewatering Solutions Armadale headquarters and pump fleet
"SERVICE FIRST" · PERTH, WESTERN AUSTRALIA · 25+ YRS

Perth's
Dewatering
Specialists.

Groundwater control for construction, civil and mining. One of the largest dewatering fleets in WA — designed, installed and managed from our Armadale yard.

25+ YEARS
WA GROUND EXPERIENCE
WA OWNED
PRIVATE AUSTRALIAN BUSINESS
TIER 1 APPROVED
METRONET · MAIN ROADS · FMG
SAME DAY
QUOTE RESPONSE
01 — SERVICES

What we do on Perth sites

Every system is designed for the ground it sits in — Bassendean sands, Guildford clays, riverside water tables. We handle design, DWER compliance, installation and 24/7 operation.

DISCUSS YOUR SITE →
/01

Well Point Dewatering

The workhorse for Perth's sandy soils — shallow excavations, trenching and pipeline works across the metro area.

/02

Deep Well Dewatering

High-capacity submersible well systems for deep basements, shafts and major civil excavations with significant groundwater.

/03

Sump / Open Pumping

Fast, flexible surface water and seepage control for open excavations — keeping your program moving after winter rain.

/04

Water Treatment & Environmental

Settlement tanks, pH correction and hydrocarbon treatment to meet DWER discharge requirements on every site.

/05

Pipe Plugs

Supply and installation of pipe plugs for pressure testing, flow isolation and maintenance on drainage and sewer infrastructure.

/06

Project Water Solutions

End-to-end site water management — supply, transfer, storage and disposal — designed around your project program.

DWS containerised pump fleet, Armadale yard FIG.01 — SOLAR POWERED PH CORRECTION UNITS, ARMADALE WA
02 — WHY DWS

We know WA ground conditions better than anyone

A
Largest fleet in Perth

Silenced skid-mounted and containerised pump sets — with fuel-efficient options — plus clarifiers and standby units, ready to mobilise from Armadale.

B
In-house design & compliance

Dewatering management plans, DWER licensing support and monitoring handled by our own engineers.

C
Tier 1 approved

Trusted by head contractors on METRONET, Main Roads and FMG projects, with the safety record to match.

D
24/7 breakdown support

Flooded excavation on a Sunday? On-call crews respond around the clock, Perth-wide.

Settlement tank washdown, DWS Armadale FIG.02 — CLARIFIER
DWS head office, 285 South Western Hwy Armadale FIG.03 — HEAD OFFICE, ARMADALE
DWS equipment detail FIG.04 — WASH BAY
03 — COMPLETED WORK

Proven on WA's biggest projects

SELECTED PROJECTS · 2019–2026

Morley–Ellenbrook Train Line

Rail

Dewatering for bridge abutments, civil works and station construction across multiple METRONET work fronts.

$6M

Armadale to Victoria Park (ALUA)

Rail

Dewatering across the METRONET Armadale Line Upgrade Alliance work fronts.

$1.4M

Tonkin Gap Alliance

Road

Dewatering for the southern dive structure and various civil works on one of Perth's largest road upgrades.

$1.5M

FMG Iron Bridge

Mining

Dewatering for an 800m river crossing in the Pilbara with MPC Kinetic — completed ahead of schedule.

$1.5M

Dunsborough Infill

Sewer

Installation of 200 drill and receival pits for a proposed sewer pipeline in the South West.

$1.2M

Western Power

Utilities

Power pole installations with booster pumps, treatment units, gas monitoring and vibration control.

$220K

Applecross Basement

Basement

Complete dewatering system for a riverside basement excavation in Perth's high water-table zone.

$60K
CURRENTLY ON SITE — ● ALKIMOS PIPELINE PROJECT ● TONKIN EXT ALLIANCE ALSO DELIVERED — KWINANA FREEWAY WIDENING GREAT NORTHERN CONNECT GERALDTON PUMP STATION BMD MANNING RD OVAL LIGHTING FOOTINGS
04 — REVIEWS

Rated by the contractors who dig with us

Google 5.0★★★★★ GOOGLE BUSINESS PROFILE →
M
★★★★★

"DWS designed and ran the dewatering across our whole dive structure. System never missed a beat and their crew responded fast every time we changed the program."

SITE MANAGER · TIER 1 CIVIL CONTRACTOR, PERTH
B
★★★★★

"Great local knowledge of the ground conditions. They had well points in and the trench dry days quicker than we expected. Would use again on any wet dig."

PROJECT ENGINEER · PIPELINE CONTRACTOR, SOUTH WEST
D
★★★★★

"High water table right on the river and DWS kept the basement bone dry from start to finish. Handled all the discharge compliance too. Highly recommend."

BUILDER · BASEMENT CONSTRUCTION, APPLECROSS
06 — GET A QUOTE

Wet site?
Talk to us today.

Send through your site details and we'll respond the same business day with pricing and a recommended system. Or skip the form:

CALL — (08) 6115 0175
OFFICE285 South Western Highway, Armadale WA 6112 EMAILinfo@dewateringsolutions.net.au HOURSMon–Fri 7am–5pm · 24/7 emergency response

Request a free quote

    SAME BUSINESS DAY RESPONSE · NO OBLIGATION

    ✆  CALL (08) 6115 0175